Torness 400/132kV: grid connection queue
Torness 400/132kV · SP Transmission (southern Scotland) · register of 26 November 2026
1 project with 150 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 31 Oct 2031 to 31 Oct 2031.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Bridge BESS | Apatura Battery Ltd | Battery storage | 150 | 31 Oct 2031 | Medium | 31 Oct 2031 | Scoping | 1 |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Torness | SP Energy Networks | 0.2 km | 6.5 MW | |
| Spott Road | SP Energy Networks | 6.9 km | 11 MW | 2.2 MW |
| Belhaven Forth | SP Energy Networks | 8.5 km | 11 MW | 0.8 MW |
| East Linton | SP Energy Networks | 16.2 km | 2.2 MW | |
| Whitchester | SP Energy Networks | 17.2 km | 3.9 MW |
Thinking of connecting near Torness 400/132kV?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- Thorntonloch 400kV: 240 MW waiting
- Branxton 400kV: 3,510 MW waiting
- Near Branxton 400kV: 2,900 MW waiting
- Braxbess 400/132kV Collector: 650 MW waiting
- Branxton 400/132kV: 1,167 MW waiting