Braxbess 400/132kV Collector: grid connection queue
Braxbess 400/132kV Collector Substation · SP Transmission (southern Scotland) · register of 26 November 2026
2 projects with 650 MW are waiting to connect here (largest by capacity: battery storage). Contracted dates run from 30 Apr 2028 to 31 Jul 2028.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Braxbess Branxton BESS | BRAXBESS LTD | Battery storage | 480 | 30 Apr 2028 | High | 30 Apr 2030 | Scoping | none |
| Innerwick BESS | Innerwick Storage Ltd | Battery storage | 170 | 31 Jul 2028 | High | 31 Jul 2030 | Scoping | none |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Torness | SP Energy Networks | 2.5 km | 6.5 MW | |
| Spott Road | SP Energy Networks | 5.6 km | 11 MW | 2.2 MW |
| Belhaven Forth | SP Energy Networks | 6.9 km | 11 MW | 0.8 MW |
| East Linton | SP Energy Networks | 14.0 km | 2.2 MW | |
| Whitchester | SP Energy Networks | 15.8 km | 3.9 MW |
Thinking of connecting near Braxbess 400/132kV Collector?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- Branxton 400kV: 3,510 MW waiting
- Near Branxton 400kV: 2,900 MW waiting
- Thorntonloch 400kV: 240 MW waiting
- Torness 400/132kV: 150 MW waiting
- Dunbar 132/33kV: 96 MW waiting