Stirling 132/33kV: grid connection queue
Stirling 132/33kV · SP Transmission (southern Scotland) · register of 26 November 2026
1 project with 60 MW is waiting to connect here (largest by capacity: onshore wind + storage). Contracted dates run from 31 Jan 2029 to 31 Jan 2029.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Touch Energy Park | Naturalis Energy Developments Ltd | Onshore wind + storage | 60 | 31 Jan 2029 | High | 18 Dec 2030 | Scoping | none |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| St. Ninians | SP Energy Networks | 1.4 km | 3.5 MW | |
| Colquhoun Street | SP Energy Networks | 1.9 km | 24 MW | 4.1 MW |
| Stirling | SP Energy Networks | 2.8 km | 26 MW | 15 MW |
| Forth Street | SP Energy Networks | 2.8 km | 15 MW | |
| Stirling University | SP Energy Networks | 5.1 km | 11 MW | |
| Menstrie | SP Energy Networks | 8.7 km | 27 MW | 7.6 MW |
Thinking of connecting near Stirling 132/33kV?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- Bonnybridge 132/33kV: 90 MW waiting
- Denny North 275/132kV: 600 MW waiting
- Denny North: 350 MW waiting
- Bainsford 132/33kV: 43 MW waiting
- Devonside 132/33kV: 85 MW waiting