Shin 1: grid connection queue
Shin 1 GSP · SSEN Transmission (northern Scotland) · register of 26 November 2026
3 projects with 164 MW are waiting to connect here (largest by capacity: onshore wind + storage, mixed and other). Contracted dates run from 30 Jun 2031 to 31 Oct 2032.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Allt an Tuir Renewable Energy Park | ALLT AN TUIR RENEWABLE ENERGY PARK LIMITED | Mixed and other | 50 | 30 Jun 2031 | Medium | 30 Jun 2031 | Scoping | none |
| Strath Oykel Wind Farm | ENERGYFARM STRATH OYKEL LLP | Onshore wind + storage | 74 | 31 Oct 2032 | Low | 31 Oct 2032 | Awaiting Consents | none |
| Meall Buidhe Wind Farm | MUIRDEN ENERGY LLP | Onshore wind | 40 | 31 Oct 2032 | Low | 31 Oct 2032 | Scoping | none |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Gledfield Primary | SSEN Distribution | 7.3 km | 0 MW | 1.7 MW |
| Shin GSP | SSEN Distribution | 8.4 km | ||
| Shin Primary | SSEN Distribution | 8.4 km | 0 MW | 2.5 MW |
| Conon Falls Primary | SSEN Distribution | 8.4 km | 0 MW | 0 MW |
| Lairg GSP | SSEN Distribution | 17.4 km | ||
| Lairg Primary | SSEN Distribution | 17.4 km | 0 MW | 1.6 MW |
Thinking of connecting near Shin 1?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- Inveroykel Wind Farm 132kV: 191 MW waiting
- Oykel Wind Farm 132kV: 79 MW waiting
- ACHANY EXTENSION WIND FARM 132/33KV: 81 MW waiting
- Coille Linne 132kV: 113 MW waiting
- Lairg: 135 MW waiting