Lairg: grid connection queue

Lairg GSP · SSEN Transmission (northern Scotland) · register of 26 November 2026

3 projects with 135 MW are waiting to connect here (largest by capacity: onshore wind, battery storage). Contracted dates run from 16 Jul 2027 to 31 Oct 2033.

3projects in the queue
135 MWwaiting to connect
0 MWalready connected
85 MWholding Gate 2
0date moves since 2 Jun 2026
85 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Lairg II Wind FarmLAIRG II LLPOnshore wind5016 Jul 2027High12 Sep 2029Consents Approved2
Strath TirryStrath Tirry Wind Energy 2021 LtdOnshore wind3519 Dec 2029High5 Nov 2031Awaiting Consents2
NAVAS BESSOPDE UK LIMITEDBattery storage5031 Oct 2033Low31 Oct 2033Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Lairg GSPSSEN Distribution5.0 km
Lairg PrimarySSEN Distribution5.0 km0 MW1.6 MW
Shin GSPSSEN Distribution12.0 km
Shin PrimarySSEN Distribution12.0 km0 MW2.5 MW
Conon Falls PrimarySSEN Distribution12.0 km0 MW0 MW
Tressady PrimarySSEN Distribution17.2 km0 MW0.2 MW

Thinking of connecting near Lairg?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points