Inveroykel Wind Farm 132kV: grid connection queue
Inveroykel Wind Farm 132kV · SSEN Transmission (northern Scotland) · register of 26 November 2026
1 project with 191 MW is waiting to connect here (largest by capacity: onshore wind). Contracted dates run from 31 Oct 2031 to 31 Oct 2031.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Inveroykel Wind Farm | RWE RENEWABLES UK SWINDON LIMITED | Onshore wind | 191 | 31 Oct 2031 | High | 16 Sep 2033 | Scoping | 1 |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Shin GSP | SSEN Distribution | 8.0 km | ||
| Shin Primary | SSEN Distribution | 8.0 km | 0 MW | 2.5 MW |
| Conon Falls Primary | SSEN Distribution | 8.0 km | 0 MW | 0 MW |
| Lairg GSP | SSEN Distribution | 12.3 km | ||
| Lairg Primary | SSEN Distribution | 12.3 km | 0 MW | 1.6 MW |
| Gledfield Primary | SSEN Distribution | 12.6 km | 0 MW | 1.7 MW |
Thinking of connecting near Inveroykel Wind Farm 132kV?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- Oykel Wind Farm 132kV: 79 MW waiting
- ACHANY EXTENSION WIND FARM 132/33KV: 81 MW waiting
- Shin 1: 164 MW waiting
- Lairg: 135 MW waiting
- Coille Linne 132kV: 113 MW waiting