Benzene

Sealand 400kV: grid connection queue

Sealand 400kV Substation · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026

1 project with 500 MW is waiting to connect here (largest by capacity: solar + storage). Contracted dates run from 30 Nov 2037 to 30 Nov 2037.

1project in the queue
500 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Green Hydrogen Solar FarmGREEN HYDROGEN SOLAR FARM LIMITEDSolar + storage50030 Nov 2037Low30 Nov 2037Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Raf Sealand T1SP Energy Networks1.2 km3.3 MW7.7 MW
Engineer Pk T1SP Energy Networks1.6 km-0.1 MW5.7 MW
Pilkingtons Queensferry T1SP Energy Networks2.1 km-0.1 MW5.7 MW
Queensferry T1SP Energy Networks2.1 km-0.1 MW5.7 MW
Deeside Ind Pk T1SP Energy Networks2.2 km3.3 MW7.7 MW
Deeside Ind Pk 6Th Ave T1SP Energy Networks2.4 km3.3 MW7.7 MW

Thinking of connecting near Sealand 400kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points