Rannoch: grid connection queue
Rannoch GSP · SSEN Transmission (northern Scotland) · register of 26 November 2026
1 project with 20 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 31 Oct 2035 to 31 Oct 2035.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Talladh a Bheithe | MUIRDEN ENERGY LLP | Battery storage | 20 | 31 Oct 2035 | Low | 31 Oct 2035 | Scoping | 1 |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Glenetive Primary | SSEN Distribution | 10.2 km | 0.3 MW | 0.3 MW |
| Blackmount Primary | SSEN Distribution | 10.7 km | 0.1 MW | 0 MW |
| Bridge of Gaur Primary | SSEN Distribution | 17.0 km | 1 MW | 0.9 MW |
| Cashlie Primary | SSEN Distribution | 17.8 km | 0 MW | 1 MW |
| Rannoch GSP | SSEN Distribution | 19.4 km | ||
| Kinlochleven GSP | SSEN Distribution | 19.5 km |
Thinking of connecting near Rannoch?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- Lochay 132/11kV: 6 MW waiting
- Killin: 43 MW waiting
- Killin 132/11kV: 18 MW waiting
- Earba PSH Powerhouse: 1,800 MW waiting
- Cruachan 275kV: 640 MW waiting