Benzene

Earba PSH Powerhouse: grid connection queue

Earba PSH Powerhouse Substation · SSEN Transmission (northern Scotland) · register of 26 November 2026

1 project with 1,800 MW is waiting to connect here (largest by capacity: hydro, pumped storage and tidal). Contracted dates run from 31 Dec 2032 to 31 Dec 2032.

1project in the queue
1,800 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Earba PSHEARBA LIMITEDHydro, pumped storage and tidal1,80031 Dec 2032Low31 Dec 2032Consents Approvednone

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Dalwhinnie PrimarySSEN Distribution16.9 km0 MW0.4 MW

Thinking of connecting near Earba PSH Powerhouse?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points