Pentland Floating Offshore Wind Farm 132/66kV substation: grid connection queue

Pentland Floating Offshore Wind Farm 132/66kV substation · SSEN Transmission (northern Scotland) · register of 26 November 2026

1 project with 100 MW is waiting to connect here (largest by capacity: offshore wind). Contracted dates run from 3 Apr 2028 to 3 Apr 2028.

1project in the queue
100 MWwaiting to connect
0 MWalready connected
100 MWholding Gate 2
1date moves since 2 Jun 2026
100 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Pentland Floating Offshore Wind FarmHIGHLAND WIND LIMITEDOffshore wind1003 Apr 2028High18 Apr 2030Consents Approved2

Dates that moved

Since 2 Jun 2026, connection dates here moved by a month or more 1 time: 1 later and 0 earlier. An earlier date can mean someone ahead dropped out or the queue was re-ordered.

Week seenProjectWasNowChange
22 Sep 2026Pentland Floating Offshore Wind Farm31 Oct 20273 Apr 2028+5 months

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Mount Pleasant PrimarySSEN Distribution1.4 km0 MW3.5 MW
Ormlie PrimarySSEN Distribution1.4 km0 MW9.9 MW
Thurso South GSPSSEN Distribution2.6 km
Forss PrimarySSEN Distribution8.9 km0 MW0.3 MW
Halkirk PrimarySSEN Distribution10.5 km0 MW0 MW
Dounreay GSPSSEN Distribution13.6 km

Thinking of connecting near Pentland Floating Offshore Wind Farm 132/66kV substation?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points