OCHILL BESS 132KV SUBSTATION: grid connection queue

OCHILL BESS 132KV SUBSTATION · SP Transmission (southern Scotland) · register of 26 November 2026

1 project with 50 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 18 Aug 2028 to 18 Aug 2028.

1project in the queue
50 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
50 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Devonside BESSCARLTON POWER LIMITEDBattery storage5018 Aug 2028High18 Aug 2030Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Glendevon PrimarySSEN Distribution4.4 km0 MW0 MW
Milnathort PrimarySSEN Distribution9.5 km0 MW0 MW
DollarSP Energy Networks11.5 km19 MW4.9 MW
Forteviot PrimarySSEN Distribution11.8 km0 MW4.2 MW
Gleneagles PrimarySSEN Distribution12.1 km0 MW1.8 MW
Bridge of Earn PrimarySSEN Distribution15.6 km0 MW11 MW

Thinking of connecting near OCHILL BESS 132KV SUBSTATION?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points