Benzene

North Kent Connection Node B 132kV: grid connection queue

North Kent Connection Node B 132kV Substation · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026

1 project with 240 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 31 Oct 2033 to 31 Oct 2033.

1project in the queue
240 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
1date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Solomons Farm BESSSolomons BESS LtdBattery storage24031 Oct 2033Low31 Oct 2033Scoping1

Dates that moved

Since 2 Jun 2026, connection dates here moved by a month or more 1 time: 1 later and 0 earlier. An earlier date can mean someone ahead dropped out or the queue was re-ordered.

Week seenProjectWasNowChange
13 Oct 2026Solomons Farm BESS31 Oct 203031 Oct 2033+36 months

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Minster 6.6kVUK Power Networks3.6 km8.3 MW4.4 MW
Eastchurch Prison 6.6kVUK Power Networks4.9 km5.9 MW3 MW
Sheerness Grid 33kVUK Power Networks6.2 km23 MW30 MW
Sheerness 6.6kVUK Power Networks6.2 km17 MW7.2 MW
Leysdown 6.6kVUK Power Networks6.9 km1.6 MW0.2 MW
Queenborough 6.6kVUK Power Networks7.0 km16 MW13 MW

Thinking of connecting near North Kent Connection Node B 132kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points