North Kent Connection Node A 400kV: grid connection queue

North Kent Connection Node A 400kV Substation · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026

2 projects with 1,280 MW are waiting to connect here (largest by capacity: battery storage). Contracted dates run from 31 Oct 2033 to 31 Oct 2034.

2projects in the queue
1,280 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Alcemi Ridham Docks BESFAlcemi Storage Developments 23 LtdBattery storage28031 Oct 2033Low31 Oct 2033Scoping1
NatPower-Medway Energy ParkOld Rides Energy Storage LimitedBattery storage1,00031 Oct 2034Low31 Oct 2034Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Grovehurst Local 11kVUK Power Networks3.5 km22 MW5.3 MW
Eastchurch Prison 6.6kVUK Power Networks4.6 km5.9 MW3 MW
Sittingbourne Town 11kVUK Power Networks4.7 km23 MW4.6 MW
Minster 6.6kVUK Power Networks5.4 km8.3 MW4.4 MW
Queenborough 6.6kVUK Power Networks6.2 km16 MW13 MW
Sittingbourne West 11kVUK Power Networks6.9 km36 MW18 MW

Thinking of connecting near North Kent Connection Node A 400kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.