Grain West 400kV: grid connection queue
Grain West 400kV Substation · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026
1 project with 249 MW is waiting to connect here (largest by capacity: solar + storage). Contracted dates run from 31 Dec 2029 to 31 Dec 2029.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| EcoGrainWest | Econergy International Limited | Solar + storage | 249 | 31 Dec 2029 | Medium | 31 Dec 2029 | Awaiting Consents | 1 |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Grain 11kV | UK Power Networks | 1.8 km | 12 MW | 3.9 MW |
| Sheerness 6.6kV | UK Power Networks | 2.8 km | 17 MW | 7.2 MW |
| Sheerness Grid 33kV | UK Power Networks | 2.8 km | 23 MW | 30 MW |
| Queenborough 6.6kV | UK Power Networks | 4.6 km | 16 MW | 13 MW |
| Minster 6.6kV | UK Power Networks | 7.0 km | 8.3 MW | 4.4 MW |
| Kingsnorth Grid 11kV | UK Power Networks | 8.9 km | 12 MW | 22 MW |
Thinking of connecting near Grain West 400kV?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- North Kent Connection Node C 400kV: 532 MW waiting
- North Kent Connection Node B 132kV: 240 MW waiting
- North Kent Connection Node A 400kV: 1,280 MW waiting
- Kemsley 400kV: 249 MW waiting
- Kemsley: 100 MW waiting