Newlands Hill 132/33kV: grid connection queue

Newlands Hill 132/33kV · SP Transmission (southern Scotland) · register of 26 November 2026

1 project with 119 MW is waiting to connect here (largest by capacity: onshore wind + storage). Contracted dates run from 3 Apr 2030 to 3 Apr 2030.

1project in the queue
119 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
119 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Newlands Hill Wind Energy HubNEWLANDS HILL WIND ENERGY HUB LIMITEDOnshore wind + storage1193 Apr 2030High18 Feb 2032Awaiting Consentsnone

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
East LintonSP Energy Networks12.3 km2.2 MW
WhitchesterSP Energy Networks13.0 km3.9 MW
PeppercraigsSP Energy Networks13.4 km15 MW12 MW
Belhaven ForthSP Energy Networks14.9 km11 MW0.8 MW
Spott RoadSP Energy Networks15.7 km11 MW2.2 MW
PencaitlandSP Energy Networks16.9 km9 MW11 MW

Thinking of connecting near Newlands Hill 132/33kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points