Manchester South connection node A 400kv: grid connection queue

Manchester South connection node A 400kv · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026

2 projects with 740 MW are waiting to connect here (largest by capacity: battery storage). Contracted dates run from 30 Oct 2037 to 30 Oct 2037.

2projects in the queue
740 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Daines NP BESSDaines Flexpower LimitedBattery storage50030 Oct 2037Low30 Oct 2037Scoping1
Siddington BESS StationIBV BIRTLES HILL ENERGY PARK LTDBattery storage24030 Oct 2037Low30 Oct 2037Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Primary substation 205306Electricity North West1.4 km7 MW0 MW
Primary substation 205320_T11_T12Electricity North West1.8 km7 MW0 MW
Primary substation 100620Electricity North West1.9 km11 MW4.5 MW
Primary substation 100622Electricity North West3.0 km11 MW1 MW
Primary substation 205302Electricity North West3.1 km30 MW13 MW
Bulk supply point 200215Electricity North West3.1 km6.7 MW0 MW

Thinking of connecting near Manchester South connection node A 400kv?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points