Kilbraur Wind Farm: grid connection queue
Kilbraur Wind Farm Substation · SSEN Transmission (northern Scotland) · register of 26 November 2026
1 project with 79 MW is waiting to connect here (largest by capacity: onshore wind). Contracted dates run from 31 Oct 2031 to 31 Oct 2031.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Kilbraur North Wind Farm | EDF ENERGY RENEWABLES LIMITED | Onshore wind | 79 | 31 Oct 2031 | High | 16 Sep 2033 | Scoping | 1 |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Torboll Primary | SSEN Distribution | 7.8 km | 0 MW | 0.1 MW |
| Golspie Primary | SSEN Distribution | 8.6 km | 0 MW | 0.8 MW |
| Tressady Primary | SSEN Distribution | 8.9 km | 0 MW | 0.2 MW |
| Brora GSP | SSEN Distribution | 11.1 km | ||
| Brora Primary | SSEN Distribution | 12.4 km | 0 MW | 4 MW |
| Dornoch Primary | SSEN Distribution | 17.6 km | 0 MW | 0 MW |
Thinking of connecting near Kilbraur Wind Farm?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- BRORA 132/33KV GRID SUPPLY POINT SUBSTATION: 60 MW waiting
- Brora: 50 MW waiting
- Chleansaid Wind Farm 132kV: 96 MW waiting
- Coille Linne 132kV: 113 MW waiting
- Dalchork 132kV: 200 MW waiting