Chleansaid Wind Farm 132kV: grid connection queue

Chleansaid Wind Farm 132kV Substation · SSEN Transmission (northern Scotland) · register of 26 November 2026

1 project with 96 MW is waiting to connect here (largest by capacity: onshore wind). Contracted dates run from 10 Sep 2028 to 10 Sep 2028.

1project in the queue
96 MWwaiting to connect
0 MWalready connected
96 MWholding Gate 2
1date moves since 2 Jun 2026
96 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Chleansaid Wind FarmESB ASSET DEVELOPMENT UK LIMITEDOnshore wind9610 Sep 2028High8 Nov 2030Consents Approved2

Dates that moved

Since 2 Jun 2026, connection dates here moved by a month or more 1 time: 1 later and 0 earlier. An earlier date can mean someone ahead dropped out or the queue was re-ordered.

Week seenProjectWasNowChange
4 Aug 2026Chleansaid Wind Farm31 Jul 202710 Sep 2028+13 months

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Lairg GSPSSEN Distribution10.4 km
Lairg PrimarySSEN Distribution10.4 km0 MW1.6 MW
Tressady PrimarySSEN Distribution15.8 km0 MW0.2 MW

Thinking of connecting near Chleansaid Wind Farm 132kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points