Creag Riabhach 132/33kV: grid connection queue

Creag Riabhach 132/33kV Substation · SSEN Transmission (northern Scotland) · register of 26 November 2026

1 project with 13 MW is waiting to connect here (largest by capacity: onshore wind). Contracted dates run from 31 Jul 2027 to 31 Jul 2027.

1project in the queue
13 MWwaiting to connect
92 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
13 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Creag Riabhach Wind FarmCREAG RIABHACH WIND FARM LTDOnshore wind1331 Jul 2027High27 Sep 2029Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Overscaig PrimarySSEN Distribution13.2 km0 MW0.2 MW
Cassley GSPSSEN Distribution13.3 km

Thinking of connecting near Creag Riabhach 132/33kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points