Inverkeithing: grid connection queue
Inverkeithing GSP · SP Transmission (southern Scotland) · register of 26 November 2026
1 project with 50 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 30 Jul 2029 to 30 Jul 2029.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| STOR Field 9 BESS | EKU ENERGY FAUNE PROJECTS (UK) LIMITED | Battery storage | 50 | 30 Jul 2029 | Medium | 30 Jul 2029 | Scoping | none |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Castlandhill | SP Energy Networks | 0.6 km | 0.7 MW | |
| Burnside | SP Energy Networks | 0.8 km | 13 MW | 19 MW |
| Dalgety | SP Energy Networks | 2.2 km | 16 MW | |
| Pitreavie | SP Energy Networks | 3.8 km | 12 MW | |
| Calais A1 | SP Energy Networks | 4.3 km | 15 MW | |
| Calais A2 | SP Energy Networks | 4.3 km | 17 MW |
Thinking of connecting near Inverkeithing?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- Inverkeithing 132/33kV: 42 MW waiting
- Halbeath 132kV: 150 MW waiting
- Mossmorran Storage BESS 132KV: 100 MW waiting
- Dunfermline 132/33kV: 60 MW waiting
- Westfield 132/33kV: 1,199 MW waiting