Inverkeithing 132/33kV: grid connection queue

Inverkeithing 132/33kV · SP Transmission (southern Scotland) · register of 26 November 2026

1 project with 42 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 31 Jul 2026 to 31 Jul 2026.

1project in the queue
42 MWwaiting to connect
0 MWalready connected
42 MWholding Gate 2
1date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Balbougie Energy CentreBalbougie Energy Centre II LimitedBattery storage4231 Jul 2026n/aConsents Approved2

Dates that moved

Since 2 Jun 2026, connection dates here moved by a month or more 1 time: 1 later and 0 earlier. An earlier date can mean someone ahead dropped out or the queue was re-ordered.

Week seenProjectWasNowChange
23 Jun 2026Balbougie Energy Centre30 Apr 202531 Jul 2026+15 months

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
CastlandhillSP Energy Networks0.6 km0.7 MW
BurnsideSP Energy Networks0.8 km13 MW19 MW
DalgetySP Energy Networks2.2 km16 MW
PitreavieSP Energy Networks3.8 km12 MW
Calais A1SP Energy Networks4.3 km15 MW
Calais A2SP Energy Networks4.3 km17 MW

Thinking of connecting near Inverkeithing 132/33kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points