Heathland 132/33kV: grid connection queue
Heathland 132/33kV Substation · SP Transmission (southern Scotland) · register of 26 November 2026
1 project with 80 MW is waiting to connect here (largest by capacity: onshore wind + storage). Contracted dates run from 29 Sep 2028 to 29 Sep 2028.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Heathland Wind Farm | EDF ENERGY RENEWABLES LIMITED | Onshore wind + storage | 80 | 29 Sep 2028 | High | 27 Nov 2030 | Scoping | none |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Forth | SP Energy Networks | 4.6 km | 1.6 MW | 16 MW |
| West Calder | SP Energy Networks | 7.7 km | 12 MW | 2.8 MW |
| Polkemmet | SP Energy Networks | 8.0 km | 11 MW | |
| Shotts | SP Energy Networks | 9.2 km | 13 MW | |
| Blackburn | SP Energy Networks | 9.3 km | 12 MW | 4.2 MW |
| Pyramid | SP Energy Networks | 11.2 km | 26 MW | 17 MW |
Thinking of connecting near Heathland 132/33kV?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- Newarthill 275 kV: 400 MW waiting
- Harburn 400kV: 250 MW waiting
- Harburn 132/33kV Grid Supply Point: 43 MW waiting
- Whitburn 400kV substation: 280 MW waiting
- Armadale 132kV: 60 MW waiting