Hawkwood Windfarm 33kV: grid connection queue

Hawkwood Windfarm 33kV Substation · SP Transmission (southern Scotland) · register of 26 November 2026

1 project with 34 MW is waiting to connect here (largest by capacity: onshore wind). Contracted dates run from 30 Apr 2030 to 30 Apr 2030.

1project in the queue
34 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
34 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Hawkwood Wind FarmWILSON RENEWABLES IV LLPOnshore wind3430 Apr 2030High16 Mar 2032Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
StrathavenSP Energy Networks3.2 km24 MW13 MW
StonehouseSP Energy Networks6.1 km19 MW1 MW
Larkhall (Primary)SP Energy Networks9.3 km2 MW13 MW
LesmahagowSP Energy Networks10.2 km10 MW15 MW
Larkhall TownSP Energy Networks10.3 km16 MW
NeilslandSP Energy Networks12.1 km24 MW9.5 MW

Thinking of connecting near Hawkwood Windfarm 33kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points