Harestanes West Wind Farm 132/33kV: grid connection queue
Harestanes West Wind Farm 132/33kV · SP Transmission (southern Scotland) · register of 26 November 2026
2 projects with 119 MW are waiting to connect here (largest by capacity: onshore wind, onshore wind + storage). Contracted dates run from 31 Mar 2028 to 1 Sep 2029.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Harestanes | ScottishPower Renewables (UK) Limited | Onshore wind + storage | 38 | 31 Mar 2028 | High | 29 May 2030 | Under Construction/Commissioning | none |
| Harestanes West Wind Farm | ScottishPower Renewables (UK) Limited | Onshore wind | 81 | 1 Sep 2029 | High | 19 Jul 2031 | Scoping | none |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Kirkbank | SP Energy Networks | 7.8 km | 10 MW | 5.3 MW |
| Heathhall | SP Energy Networks | 13.8 km | 18 MW | 11 MW |
| Heathfield | SP Energy Networks | 13.8 km | 13 MW | |
| Moffat | SP Energy Networks | 13.9 km | 8.5 MW | 3.6 MW |
| Lochside | SP Energy Networks | 15.6 km | 11 MW | 7.1 MW |
| Dunscore | SP Energy Networks | 15.8 km | 7.9 MW | 8.5 MW |
Thinking of connecting near Harestanes West Wind Farm 132/33kV?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- Windyhill 275/132kV: 200 MW waiting
- Daer Wind Farm 132/33kV: 96 MW waiting
- Moffat 400kV: 500 MW waiting
- Scoop Hill Wind Farm 132kV: 500 MW waiting
- Watchman 132kV: 250 MW waiting