Benzene

Daer Wind Farm 132/33kV: grid connection queue

Daer Wind Farm 132/33kV · SP Transmission (southern Scotland) · register of 26 November 2026

1 project with 96 MW is waiting to connect here (largest by capacity: onshore wind). Contracted dates run from 1 Aug 2028 to 1 Aug 2028.

1project in the queue
96 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
96 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Daer Wind FarmRWE Renewables UK Onshore Wind LimitedOnshore wind961 Aug 2028High29 Sep 2030Awaiting Consentsnone

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
MoffatSP Energy Networks9.6 km8.5 MW3.6 MW
KirkbankSP Energy Networks18.4 km10 MW5.3 MW
PenpontSP Energy Networks19.0 km3.5 MW

Thinking of connecting near Daer Wind Farm 132/33kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points