Benzene

Scoop Hill Wind Farm 132kV: grid connection queue

Scoop Hill Wind Farm 132kV Substation · SP Transmission (southern Scotland) · register of 26 November 2026

1 project with 500 MW is waiting to connect here (largest by capacity: onshore wind). Contracted dates run from 31 Oct 2027 to 31 Oct 2027.

1project in the queue
500 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
500 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Scoop Hill Wind FarmCommunity Windpower LimitedOnshore wind50031 Oct 2027High28 Dec 2029Awaiting Consents1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
MoffatSP Energy Networks8.2 km8.5 MW3.6 MW
KirkbankSP Energy Networks10.2 km10 MW5.3 MW
LockerbieSP Energy Networks17.8 km27 MW8.6 MW

Thinking of connecting near Scoop Hill Wind Farm 132kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points