Benzene

Galashiels 132/33kV: grid connection queue

Galashiels 132/33kV · SP Transmission (southern Scotland) · register of 26 November 2026

1 project with 73 MW is waiting to connect here (largest by capacity: onshore wind + storage). Contracted dates run from 5 Sep 2031 to 5 Sep 2031.

1project in the queue
73 MWwaiting to connect
0 MWalready connected
73 MWholding Gate 2
0date moves since 2 Jun 2026
73 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Leithenwater Wind FarmLEITHENWATER WIND ENERGY HUB LIMITEDOnshore wind + storage735 Sep 2031High22 Jul 2033Awaiting Consents2

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Yair BridgeSP Energy Networks5.9 km5.2 MW
SelkirkSP Energy Networks7.2 km11 MW4.5 MW
Glendinning TerraceSP Energy Networks8.4 km2.1 MW
NetherdaleSP Energy Networks9.8 km27 MW9.3 MW
St. BoswellsSP Energy Networks17.8 km8.7 MW2.6 MW
Earlston (Borders)SP Energy Networks17.9 km1.6 MW

Thinking of connecting near Galashiels 132/33kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points