Benzene

Frodsham 132kV: grid connection queue

Frodsham 132kV · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026

2 projects with 350 MW are waiting to connect here (largest by capacity: solar + storage, battery storage). Contracted dates run from 30 Apr 2029 to 31 Oct 2037.

2projects in the queue
350 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Frodsham Solar ParkFrodsham Solar LimitedSolar + storage20030 Apr 2029Medium30 Apr 2029Scopingnone
Clifton Lane 150MW BSSRENEWABLES NORTH WEST LTDBattery storage15031 Oct 2037Low31 Oct 2037Scopingnone

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Dutton Gt2SP Energy Networks2.2 km64 MW33 MW
Frodsham Local T1SP Energy Networks2.6 km1.9 MW
Bass Charrington T1SP Energy Networks2.8 km3.6 MW15 MW
Bass Charrington T2SP Energy Networks2.8 km3.6 MW15 MW
Clifton T1SP Energy Networks3.2 km3.6 MW15 MW
Murdishaw T1SP Energy Networks3.4 km0.3 MW6.9 MW

Thinking of connecting near Frodsham 132kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points