Benzene

Cheshire Connection Node A2 400kV: grid connection queue

Cheshire Connection Node A2 400kV · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026

2 projects with 1,550 MW are waiting to connect here (largest by capacity: battery storage, solar + storage). Contracted dates run from 30 Oct 2037 to 31 Oct 2037.

2projects in the queue
1,550 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
New Marton GECNEW MARTON GREEN ENERGY CENTRE LIMITEDSolar + storage55030 Oct 2037Low30 Oct 2037Scoping1
NatPower Oswestry Green Energy ParkNP SPV 43 LIMITEDBattery storage1,00031 Oct 2037Low31 Oct 2037Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Over T1SP Energy Networks1.6 km3.9 MW12 MW
Wharton Pk T1SP Energy Networks1.9 km3.9 MW12 MW
Church St Winsford T1SP Energy Networks2.0 km3.9 MW12 MW
Woodford Pk T1SP Energy Networks2.5 km3.9 MW12 MW
Winsford Gt1SP Energy Networks2.8 km92 MW36 MW
Winsford Gt2SP Energy Networks2.8 km92 MW36 MW

Thinking of connecting near Cheshire Connection Node A2 400kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points