Cheshire Connection Node A2 400kV: grid connection queue
Cheshire Connection Node A2 400kV · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026
2 projects with 1,550 MW are waiting to connect here (largest by capacity: battery storage, solar + storage). Contracted dates run from 30 Oct 2037 to 31 Oct 2037.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| New Marton GEC | NEW MARTON GREEN ENERGY CENTRE LIMITED | Solar + storage | 550 | 30 Oct 2037 | Low | 30 Oct 2037 | Scoping | 1 |
| NatPower Oswestry Green Energy Park | NP SPV 43 LIMITED | Battery storage | 1,000 | 31 Oct 2037 | Low | 31 Oct 2037 | Scoping | 1 |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Over T1 | SP Energy Networks | 1.6 km | 3.9 MW | 12 MW |
| Wharton Pk T1 | SP Energy Networks | 1.9 km | 3.9 MW | 12 MW |
| Church St Winsford T1 | SP Energy Networks | 2.0 km | 3.9 MW | 12 MW |
| Woodford Pk T1 | SP Energy Networks | 2.5 km | 3.9 MW | 12 MW |
| Winsford Gt1 | SP Energy Networks | 2.8 km | 92 MW | 36 MW |
| Winsford Gt2 | SP Energy Networks | 2.8 km | 92 MW | 36 MW |
Thinking of connecting near Cheshire Connection Node A2 400kV?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- Cheshire Connection Node A 400kV: 5,130 MW waiting
- Frodsham 400kV: 740 MW waiting
- Frodsham 132kV: 350 MW waiting
- Cheshire Connection Node B 400kV: 800 MW waiting
- Fiddlers Ferry 275kV: 1,300 MW waiting