FORT AUGUSTUS 2 400/33kV GRID SUPPLY POINT SUBSTATION: grid connection queue

FORT AUGUSTUS 2 400/33kV GRID SUPPLY POINT SUBSTATION · SSEN Transmission (northern Scotland) · register of 26 November 2026

1 project with 50 MW is waiting to connect here (largest by capacity: onshore wind). Contracted dates run from 31 Oct 2035 to 31 Oct 2035.

1project in the queue
50 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Millennium EastRenantis UK LimitedOnshore wind5031 Oct 2035Low31 Oct 2035Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Glendoe PrimarySSEN Distribution0.8 km0 MW0.7 MW
Bunoich PrimarySSEN Distribution1.8 km0 MW1.8 MW
Fort Augustus GSPSSEN Distribution3.8 km
Aberchalder PrimarySSEN Distribution7.9 km0 MW0.1 MW
Wester Drummond PrimarySSEN Distribution8.4 km0 MW0.1 MW
Ardochy PrimarySSEN Distribution9.0 km0 MW0.1 MW

Thinking of connecting near FORT AUGUSTUS 2 400/33kV GRID SUPPLY POINT SUBSTATION?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points