DRAGON GREEN 400kV SUBSTATION: grid connection queue

DRAGON GREEN 400kV SUBSTATION · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026

2 projects with 750 MW are waiting to connect here (largest by capacity: solar + storage, battery storage). Contracted dates run from 11 Sep 2037 to 30 Nov 2037.

2projects in the queue
750 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Bolney BESSCSE45 LIMITEDBattery storage5011 Sep 2037Low11 Sep 2037Scoping1
Bolney Farm 2DRAGON GREEN 7 RENEWABLES LTDSolar + storage70030 Nov 2037Low30 Nov 2037Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Bolney Grid 33kVUK Power Networks0.8 km25 MW12 MW
Cowfold 11kVUK Power Networks2.2 km14 MW2.3 MW
Goddards Green Grid 33kVUK Power Networks5.9 km114 MW38 MW
Goddards Green 11kVUK Power Networks6.0 km18 MW12 MW
Hurstpierpoint 11kVUK Power Networks6.3 km9.7 MW4.1 MW
Burgess Hill 11kVUK Power Networks7.3 km25 MW2.7 MW

Thinking of connecting near DRAGON GREEN 400kV SUBSTATION?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points