Corriemoillie 132kV: grid connection queue
Corriemoillie 132kV Substation · SSEN Transmission (northern Scotland) · register of 26 November 2026
1 project with 200 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 30 Sep 2029 to 30 Sep 2029.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Corriemoillie BESS | FIELD CORRIEMOILLIE LTD | Battery storage | 200 | 30 Sep 2029 | Medium | 30 Sep 2029 | Scoping | 1 |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Loch Glascarnoch Primary | SSEN Distribution | 5.6 km | 0 MW | 0.6 MW |
| Grudie Bridge GSP | SSEN Distribution | 5.8 km | ||
| Garbat Forest Primary | SSEN Distribution | 7.0 km | 0 MW | 0.1 MW |
| Comrie Primary | SSEN Distribution | 13.1 km | 0 MW | 0 MW |
| Orrin GSP | SSEN Distribution | 15.6 km | ||
| Marybank Primary | SSEN Distribution | 18.1 km | 0 MW | 0 MW |
Thinking of connecting near Corriemoillie 132kV?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- Corriemoillie 132/33kV: 200 MW waiting
- Corriemoillie 2 400/132kV: 82 MW waiting
- Loch Luichart Extension II: 36 MW waiting
- Carn Fearna Wind Farm 132/33kV: 85 MW waiting
- Fairburn Extension 132/33kV: 90 MW waiting