Cockenzie 275/33kV: grid connection queue

Cockenzie 275/33kV Substation · SP Transmission (southern Scotland) · register of 26 November 2026

1 project with 63 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 31 Oct 2028 to 31 Oct 2028.

1project in the queue
63 MWwaiting to connect
0 MWalready connected
63 MWholding Gate 2
0date moves since 2 Jun 2026
63 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Dolphingstone FarmBSSL EAST LOTHIAN 1 LTDBattery storage6331 Oct 2028High31 Oct 2030Consents Approved2

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
PencaitlandSP Energy Networks3.8 km9 MW11 MW
PeppercraigsSP Energy Networks6.4 km15 MW12 MW
TranentSP Energy Networks8.6 km28 MW3.9 MW
PrestonpansSP Energy Networks9.7 km26 MW13 MW
East LintonSP Energy Networks13.5 km2.2 MW
MonktonhallSP Energy Networks13.8 km27 MW8.8 MW

Thinking of connecting near Cockenzie 275/33kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points