Cnoc Buidhe 132kV/33kV: grid connection queue

Cnoc Buidhe 132kV/33kV Substation · SSEN Transmission (northern Scotland) · register of 26 November 2026

1 project with 220 MW is waiting to connect here (largest by capacity: onshore wind + storage). Contracted dates run from 2 Apr 2030 to 2 Apr 2030.

1project in the queue
220 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
220 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Cnoc Buidhe Wind FarmCNOC BUIDHE WIND ENERGY HUB LIMITEDOnshore wind + storage2202 Apr 2030High17 Feb 2032Scopingnone

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Campbeltown PrimarySSEN Distribution0.6 km0 MW8.3 MW
Dippen PrimarySSEN Distribution19.0 km0 MW0.7 MW
Carradale 1 GSPSSEN Distribution19.6 km
Carradale 2 GSPSSEN Distribution19.6 km

Thinking of connecting near Cnoc Buidhe 132kV/33kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points