Cloich 132kV: grid connection queue

Cloich 132kV Substation · SP Transmission (southern Scotland) · register of 26 November 2026

1 project with 67 MW is waiting to connect here (largest by capacity: onshore wind). Contracted dates run from 31 Jul 2029 to 31 Jul 2029.

1project in the queue
67 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
67 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Cloich Forest Wind FarmEDF ENERGY RENEWABLES LIMITEDOnshore wind6731 Jul 2029High17 Jun 2031Scopingnone

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
West LintonSP Energy Networks6.5 km11 MW5.4 MW
KingslandSP Energy Networks7.9 km12 MW0.9 MW
LoanstoneSP Energy Networks12.8 km8.2 MW6.3 MW
PenicuikSP Energy Networks13.4 km12 MW3.7 MW
Bush EstateSP Energy Networks16.2 km11 MW16 MW
BurghleeSP Energy Networks18.3 km6.1 MW

Thinking of connecting near Cloich 132kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points