Clauchrie 132/33KV: grid connection queue

Clauchrie 132/33KV Substation · SP Transmission (southern Scotland) · register of 26 November 2026

1 project with 108 MW is waiting to connect here (largest by capacity: onshore wind + storage). Contracted dates run from 30 Jan 2033 to 30 Jan 2033.

1project in the queue
108 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
1date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Clauchrie WindfarmScottishPower Renewables (UK) LimitedOnshore wind + storage10830 Jan 2033Low30 Jan 2033Scoping1

Dates that moved

Since 2 Jun 2026, connection dates here moved by a month or more 1 time: 0 later and 1 earlier. An earlier date can mean someone ahead dropped out or the queue was re-ordered.

Week seenProjectWasNowChange
17 Nov 2026Clauchrie Windfarm31 May 203330 Jan 2033-4 months

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
PinwherrySP Energy Networks9.9 km7 MW5.4 MW
GirvanSP Energy Networks14.6 km6.9 MW12 MW

Thinking of connecting near Clauchrie 132/33KV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points