Ceislien Wind Farm: grid connection queue

Ceislien Wind Farm · SSEN Transmission (northern Scotland) · register of 26 November 2026

1 project with 86 MW is waiting to connect here (largest by capacity: onshore wind). Contracted dates run from 31 Oct 2030 to 31 Oct 2030.

1project in the queue
86 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
1date moves since 2 Jun 2026
86 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Ceislein Wind FarmRWE Renewables UK Onshore Wind LimitedOnshore wind8631 Oct 2030High16 Sep 2032Scoping1

Dates that moved

Since 2 Jun 2026, connection dates here moved by a month or more 1 time: 0 later and 1 earlier. An earlier date can mean someone ahead dropped out or the queue was re-ordered.

Week seenProjectWasNowChange
13 Oct 2026Ceislein Wind Farm31 Oct 203131 Oct 2030-12 months

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Dingwall PrimarySSEN Distribution1.5 km0 MW0 MW
Conon Bridge PrimarySSEN Distribution3.4 km0 MW0 MW
Marybank PrimarySSEN Distribution9.9 km0 MW0 MW
Muirend PrimarySSEN Distribution10.3 km0 MW0.1 MW
Muir of Ord PrimarySSEN Distribution10.6 km0 MW0 MW
Orrin GSPSSEN Distribution12.5 km

Thinking of connecting near Ceislien Wind Farm?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.