Berwick 132/33kV: grid connection queue

Berwick 132/33kV · SP Transmission (southern Scotland) · register of 26 November 2026

1 project with 100 MW is waiting to connect here (largest by capacity: mixed and other). Contracted dates run from 31 Oct 2031 to 31 Oct 2031.

1project in the queue
100 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Berwick Solar Wind and Battery StorageBERWICK RENEWABLES TX LIMITEDMixed and other10031 Oct 2031Medium31 Oct 2031Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
HorncliffeSP Energy Networks2.4 km-10.4 MW1.2 MW
LoaningSP Energy Networks4.5 km27 MW11 MW
North RoadSP Energy Networks5.7 km12 MW2 MW
NorhamSP Energy Networks6.1 km2.8 MW1.2 MW
ChirnsideSP Energy Networks8.6 km22 MW8.6 MW
AytonSP Energy Networks8.9 km0.4 MW

Thinking of connecting near Berwick 132/33kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points