Kelloe Mains 400kV: grid connection queue

Kelloe Mains 400kV Substation · SP Transmission (southern Scotland) · register of 26 November 2026

3 projects with 854 MW are waiting to connect here (largest by capacity: battery storage, mixed and other). Contracted dates run from 22 Nov 2029 to 30 Oct 2033.

3projects in the queue
854 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Kelloe MainsTBC 003 LIMITEDBattery storage40022 Nov 2029Medium22 Nov 2029Scoping1
Lees Hill Renewable Energy ParkFRED OLSEN RENEWABLES LIMITEDMixed and other5415 Apr 2033Low15 Apr 2033Scopingnone
Edrom Green Energy ParkNP SPV 45 LIMITEDBattery storage40030 Oct 2033Low30 Oct 2033Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
DunsSP Energy Networks0.9 km-21.2 MW4.3 MW
WhitchesterSP Energy Networks8.3 km3.9 MW
ChirnsideSP Energy Networks9.1 km22 MW8.6 MW
GreenlawSP Energy Networks10.6 km3.9 MW
NorhamSP Energy Networks13.7 km2.8 MW1.2 MW
ColdstreamSP Energy Networks15.3 km1.8 MW

Thinking of connecting near Kelloe Mains 400kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points