Tomatin 132kV Substation Extension: grid connection queue

Tomatin 132kV Substation Extension · SSEN Transmission (northern Scotland) · register of 26 November 2026

1 project with 91 MW is waiting to connect here (largest by capacity: onshore wind + storage). Contracted dates run from 31 Oct 2037 to 31 Oct 2037.

1project in the queue
91 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Kyllachy Wind FarmWIND ESTATE (UK) LIMITEDOnshore wind + storage9131 Oct 2037Low31 Oct 2037Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Tomatin PrimarySSEN Distribution1.6 km0 MW0 MW
Inverarnie PrimarySSEN Distribution13.1 km0 MW0 MW
Boat of Garten GSPSSEN Distribution17.9 km
Boat of Garten PrimarySSEN Distribution17.9 km0 MW7.2 MW
Culloden PrimarySSEN Distribution19.1 km0 MW0 MW
Hilton PrimarySSEN Distribution19.5 km0 MW0 MW

Thinking of connecting near Tomatin 132kV Substation Extension?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points