Clune 132/33 kV: grid connection queue
Clune 132/33 kV Substation · SSEN Transmission (northern Scotland) · register of 26 November 2026
1 project with 187 MW is waiting to connect here (largest by capacity: onshore wind + storage). Contracted dates run from 30 Apr 2030 to 30 Apr 2030.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Clune Wind Farm | Renewable Energy Systems Limited | Onshore wind + storage | 187 | 30 Apr 2030 | High | 16 Mar 2032 | Scoping | 1 |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Tomatin Primary | SSEN Distribution | 0.5 km | 0 MW | 0 MW |
| Inverarnie Primary | SSEN Distribution | 11.9 km | 0 MW | 0 MW |
| Culloden Primary | SSEN Distribution | 17.8 km | 0 MW | 0 MW |
| Hilton Primary | SSEN Distribution | 18.2 km | 0 MW | 0 MW |
| Raigmore Primary | SSEN Distribution | 18.6 km | 0 MW | 0 MW |
| Boat of Garten GSP | SSEN Distribution | 19.1 km |
Thinking of connecting near Clune 132/33 kV?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- Lynemore Windfarm 132kV: 84 MW waiting
- Tomatin 132kV Substation Extension: 91 MW waiting
- FARR WIND FARM 132/33KV SUBSTATION: 145 MW waiting
- Balnespick Wind Farm 132kV/33kV: 58 MW waiting
- Nairn 132/33kV Grid Supply Point: 50 MW waiting