Solent Connection Node B 132kV: grid connection queue

Solent Connection Node B 132kV Substation · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026

1 project with 120 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 30 Oct 2037 to 30 Oct 2037.

1project in the queue
120 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Pigeon House BESSVoltwise Power Holdings LimitedBattery storage12030 Oct 2037Low30 Oct 2037Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Townhill Park PrimarySSEN Distribution0.5 km0 MW7.5 MW
Bitterne PrimarySSEN Distribution1.2 km0 MW3.4 MW
Woodmill Lane PrimarySSEN Distribution1.9 km0 MW13 MW
Bevois Valley PrimarySSEN Distribution2.8 km0 MW0 MW
Woolston PrimarySSEN Distribution3.3 km0 MW7.5 MW
Netley Common BSPSSEN Distribution3.3 km0 MW7.5 MW

Thinking of connecting near Solent Connection Node B 132kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.