Shaftesbury 132kV: grid connection queue

Shaftesbury 132kV Substation · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026

1 project with 100 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 6 Dec 2036 to 6 Dec 2036.

1project in the queue
100 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Shaftesbury Energy ParkTAGENERGY DEVELOPMENT UK LIMITEDBattery storage1006 Dec 2036Low6 Dec 2036Consents Approvednone

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Shaftesbury BSPSSEN Distribution0.3 km0 MW31 MW
Shaftesbury PrimarySSEN Distribution0.7 km0 MW0 MW
Gillingham PrimarySSEN Distribution5.4 km0 MW26 MW
West Stour PrimarySSEN Distribution7.7 km0 MW4.7 MW
Tisbury PrimarySSEN Distribution9.8 km0 MW0.7 MW
Bourton PrimarySSEN Distribution10.1 km0 MW3 MW

Thinking of connecting near Shaftesbury 132kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points