Benzene

Rothienorman 400kV: grid connection queue

Rothienorman 400kV Substation · SSEN Transmission (northern Scotland) · register of 26 November 2026

1 project with 500 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 30 Jul 2029 to 30 Jul 2029.

1project in the queue
500 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
1date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Rothienorman BatteryBLACKFORD RENEWABLES LTDBattery storage50030 Jul 2029Medium30 Jul 2029Scoping1

Dates that moved

Since 2 Jun 2026, connection dates here moved by a month or more 1 time: 0 later and 1 earlier. An earlier date can mean someone ahead dropped out or the queue was re-ordered.

Week seenProjectWasNowChange
13 Oct 2026Rothienorman Battery31 Oct 203330 Jul 2029-51 months

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Rothienorman GSPSSEN Distribution3.1 km
Fyvie PrimarySSEN Distribution4.9 km0 MW0 MW
Insch PrimarySSEN Distribution11.5 km0 MW0.5 MW
Oldmeldrum PrimarySSEN Distribution12.7 km0 MW0 MW
Methlick PrimarySSEN Distribution13.2 km0 MW0 MW
Inverurie PrimarySSEN Distribution14.5 km0 MW12 MW

Thinking of connecting near Rothienorman 400kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points