Red Moss Farm 132kV: grid connection queue

Red Moss Farm 132kV Substation · SP Transmission (southern Scotland) · register of 26 November 2026

1 project with 300 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 30 May 2031 to 30 May 2031.

1project in the queue
300 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
1date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Red Moss FarmQAIR RENEWABLES UK LIMITEDBattery storage30030 May 2031Medium30 May 2031Scoping1

Dates that moved

Since 2 Jun 2026, connection dates here moved by a month or more 1 time: 1 later and 0 earlier. An earlier date can mean someone ahead dropped out or the queue was re-ordered.

Week seenProjectWasNowChange
13 Oct 2026Red Moss Farm30 Oct 203030 May 2031+7 months

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Douglas WestSP Energy Networks8.5 km22 MW15 MW
SymingtonSP Energy Networks15.3 km12 MW3.3 MW
LesmahagowSP Energy Networks16.6 km10 MW15 MW
Corra LinnSP Energy Networks16.8 km4.6 MW8 MW
LanarkSP Energy Networks18.3 km26 MW17 MW
FauldheadSP Energy Networks19.5 km9.4 MW5.7 MW

Thinking of connecting near Red Moss Farm 132kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points