Benzene

Bodinglee Wind Farm 132kV: grid connection queue

Bodinglee Wind Farm 132kV · SP Transmission (southern Scotland) · register of 26 November 2026

1 project with 280 MW is waiting to connect here (largest by capacity: onshore wind + storage). Contracted dates run from 30 Apr 2029 to 30 Apr 2029.

1project in the queue
280 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
280 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Bodinglee Wind FarmBodinglee Wind Farm LimitedOnshore wind + storage28030 Apr 2029High17 Mar 2031Awaiting Consentsnone

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Douglas WestSP Energy Networks4.0 km22 MW15 MW
LesmahagowSP Energy Networks12.5 km10 MW15 MW
Corra LinnSP Energy Networks14.1 km4.6 MW8 MW
LanarkSP Energy Networks15.8 km26 MW17 MW
SymingtonSP Energy Networks16.0 km12 MW3.3 MW
CronberrySP Energy Networks19.4 km7.9 MW7.3 MW

Thinking of connecting near Bodinglee Wind Farm 132kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points