Benzene

Peterhead Grange: grid connection queue

Peterhead Grange GSP · SSEN Transmission (northern Scotland) · register of 26 November 2026

1 project with 50 MW is waiting to connect here (largest by capacity: offshore wind). Contracted dates run from 31 Oct 2033 to 31 Oct 2033.

1project in the queue
50 MWwaiting to connect
30 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Project Flora PeterheadJERA NEX BP NORTH EAST LIMITEDOffshore wind5031 Oct 2033Low31 Oct 2033Scopingnone

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Peterhead Grange GSPSSEN Distribution3.6 km
Peterhead Grange PrimarySSEN Distribution3.6 km0 MW0 MW
Peterhead North Street PrimarySSEN Distribution5.3 km0 MW0 MW
Peterhead Shell GSPSSEN Distribution6.0 km
Boddam PrimarySSEN Distribution6.3 km7.3 MW0 MW
Stoneyhill PrimarySSEN Distribution6.3 km0 MW3.8 MW

Thinking of connecting near Peterhead Grange?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points