Longside 400kV: grid connection queue

Longside 400kV Substation · SSEN Transmission (northern Scotland) · register of 26 November 2026

5 projects with 5,500 MW are waiting to connect here (largest by capacity: offshore wind, battery storage). Contracted dates run from 31 Oct 2031 to 31 Oct 2033.

5projects in the queue
5,500 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
2date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Marram Wind Offshore Wind FarmMarramwind LimitedOffshore wind3,00031 Oct 2031Medium31 Oct 2031Scopingnone
Muir Mhor Offshore Wind FarmMUIR MHÒR OFFSHORE WIND FARM LIMITEDOffshore wind1,00031 Oct 2033Low31 Oct 2033Awaiting Consentsnone
Broadshore Offshore Wind FarmBroadshore Offshore Wind Farm LimitedOffshore wind90031 Oct 2033Low31 Oct 2033Scopingnone
Netherton BESSHARMONY ENERGY LIMITEDBattery storage40031 Oct 2033Low31 Oct 2033Scoping1
Netherton Hub BessField Netherton LtdBattery storage20031 Oct 2033Low31 Oct 2033Scoping1

Dates that moved

Since 2 Jun 2026, connection dates here moved by a month or more 2 times: 1 later and 1 earlier. An earlier date can mean someone ahead dropped out or the queue was re-ordered.

Week seenProjectWasNowChange
20 Oct 2026Netherton Hub Bess31 Oct 203531 Oct 2033-24 months
13 Oct 2026Netherton Hub Bess31 Oct 203331 Oct 2035+24 months

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Mintlaw PrimarySSEN Distribution3.1 km0 MW0 MW
Stoneyhill PrimarySSEN Distribution7.4 km0 MW3.8 MW
Peterhead Grange GSPSSEN Distribution8.1 km
Peterhead Grange PrimarySSEN Distribution8.1 km0 MW0 MW
St Fergus GSPSSEN Distribution8.3 km
Peterhead Shell GSPSSEN Distribution9.5 km

Thinking of connecting near Longside 400kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points