Longside 132kV: grid connection queue

Longside 132kV Substation · SSEN Transmission (northern Scotland) · register of 26 November 2026

2 projects with 200 MW are waiting to connect here (largest by capacity: offshore wind). Contracted dates run from 31 Oct 2033 to 31 Oct 2033.

2projects in the queue
200 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Scaraben Offshore Wind FarmSCARABEN OFFSHORE WIND FARM LIMITEDOffshore wind10031 Oct 2033Low31 Oct 2033Scopingnone
Sinclair Offshore Wind FarmSINCLAIR OFFSHORE WIND FARM LIMITEDOffshore wind10031 Oct 2033Low31 Oct 2033Scopingnone

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Mintlaw PrimarySSEN Distribution3.1 km0 MW0 MW
Stoneyhill PrimarySSEN Distribution7.4 km0 MW3.8 MW
Peterhead Grange GSPSSEN Distribution8.1 km
Peterhead Grange PrimarySSEN Distribution8.1 km0 MW0 MW
St Fergus GSPSSEN Distribution8.3 km
Peterhead Shell GSPSSEN Distribution9.5 km

Thinking of connecting near Longside 132kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points