NLEI Windfarm 132/33kV substation: grid connection queue

NLEI Windfarm 132/33kV substation · SP Transmission (southern Scotland) · register of 26 November 2026

1 project with 151 MW is waiting to connect here (largest by capacity: onshore wind). Contracted dates run from 30 Apr 2031 to 30 Apr 2031.

1project in the queue
151 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
151 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
North Lowther Energy InitiativeGlensalloch Wind Farm LimitedOnshore wind15130 Apr 2031High16 Mar 2033Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
FauldheadSP Energy Networks10.7 km9.4 MW5.7 MW
Douglas WestSP Energy Networks15.9 km22 MW15 MW

Thinking of connecting near NLEI Windfarm 132/33kV substation?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points